We support our partner Goldbeck Solar in the planning and implementation of the solar park Solarvation Lelystad II (NL). A particular challenge was the short construction period and the ground conditions. Lelystad II was completed on time in summer 2020 and now has a total installed capacity of 42 MWp. A special feature of the Lelystad Solar Park is that every citizen had the opportunity to participate in the sustainable energy production in Lelystad.