Lelystad
Citizens as co-investors
We are helping our partner Goldbeck Solar in the planning and implementation of the Solarvation Lelystad II solar farm (NL). A particular challenge was the short construction time and the soil conditions. Lelystad II was completed on time in summer 2020 and now has a total installed capacity of 42 MWp. A special feature of the Lelystad solar farm is that every citizen had the opportunity to participate in the sustainable energy production in Lelystad.
Thanks to competent and efficient cooperation with our partner re.venture, we were able to realize a short construction period in the usual GOLDBECK quality. Many years of experience, high-quality engineering, adherence to schedules and trusting cooperation are highly appreciated by us.
Tobias Schüssler
COO Goldbeck Solar
Date:
23. February 2022